QUALITY & CONTROL
The 7-Stage Jewellery QC Checklist: Dimensional Caliper Gates to Non-Destructive XRF Assay Testing
Inside the quality control architecture of an international B2B fine jewellery atelier. A detailed operational review of the seven sequential inspection gates every piece must pass before cleanroom dispatch.
8 min read
1. The Seven Quality Verification Gates
To ensure zero customer returns for brand partners, pieces pass through seven distinct physical and metallurgical verification gates before packing.
- ✓Gate 1: Raw Casting Metallurgical & Visual Audit (porosity and shrinkage check)
- ✓Gate 2: CNC & Bench Metrology (dimensional caliper tolerance verification within ±0.03mm)
- ✓Gate 3: Pre-Polish Surface Uniformity (removal of investment scale and sprue marks)
- ✓Gate 4: Microscope Setting & Claw Push Test (individual stone mechanical retention probe)
- ✓Gate 5: Optical Surface Lapidary Audit (mirror buff and facet crispness check under 20x)
- ✓Gate 6: XRF Alloy Assay & Electroplate Depth (spectrometry karatage and 0.5µm rhodium depth)
- ✓Gate 7: Cleanroom Serialization & Final Packaging Audit (barcode, hallmark, and box fitment match)
📷
2. Caliper Metrology & Dimensional Accuracy
Internal finger diameters, eternity band heights, and pendant bezels are verified with calibrated optical and digital micrometers to guarantee that ring sizes conform strictly to ISO 8653 sizing charts.
📷
3. Non-Destructive XRF Assay Testing
Energy-dispersive X-ray fluorescence (ED-XRF) verifies precious metal purity without destructive fire assay drilling, ensuring that all 18K pieces test at or above 75.0% gold content.
📷
Require Verified Quality & Traceability Records?
Review our complete 7-stage quality control documentation, ISO 9001 compliance records, and RJC certification.
CONNECTED TECHNICAL GUIDES
Related Manufacturing Insights
FROM SPECIFICATION TO PRODUCTION
Ready to Work with a Transparent Manufacturer?
Start your project with formal quality gates, inspection logs, and sealed golden samples.